ProDesign was commissioned by Government House to initially service existing specialty lighting within the Lobby. These works were then extended to produce a Master Plan for the property, including a energy management evaluation of the House and Offices.
![c93c8b22a24f107e5d3d4baf7df3c0cb Government House Perth Lighting Event](https://pro-design.com.au/wp-content/uploads/2022/08/c93c8b22a24f107e5d3d4baf7df3c0cb.jpg)
![2208c94de8c331d908b3ee99a67c2f19 Government House Perth Lighting Event Image 2](https://pro-design.com.au/wp-content/uploads/2022/08/2208c94de8c331d908b3ee99a67c2f19.jpg)
Ongoing consultancy and design services maintain the integrity of the property for day to day operation and special events.
Energy Management Implementation at 5%
Percentage Saving – 11.14%
Uncontrolled Supply at 5% Over Voltage
Percentage Lost – 14.94%
Worst Case Scenario
The Lighting Costs could be 26.08% more than they need to be
Services employed in this case study:
Specialist Lighting Consultancy
Energy Management Solutions